How to Specify SS316L Marine Mooring Cleats in an RFQ: Load Rating, Casting Route, Testing and Finish

By Eric Yang, Sales Manager, HUAYUN Stainless Steel · Updated

A recent request from an offshore and marine contractor asked for SS316L mooring cleats in two load classes, in the low hundreds of pieces, for continuous seawater exposure, and sent only a rating and a reference photo. Requests like this are common, and the first quotation is only as accurate as the specification behind it. The answers below explain what a foundry needs to know before it can quote a mooring cleat, and which choices decide the price and the lead time.

Questions and answers

What load information should an RFQ for mooring cleats include?

State the rated safe working load (SWL) of each size, the standard or classification rule that defines it, and whether a proof-load test is required.

  • Safe working load (SWL) is the load the cleat is rated to carry in service. The minimum breaking load is higher by a safety factor, and the factor depends on the rule you follow (a class society, a port authority or your customer's own specification), so the factor should be written in the RFQ rather than assumed.
  • Who sets the rating. A cleat shape does not carry a rating by itself. The rating comes from the design calculation or the test, so say whether you supply the design and the calculation or you expect the supplier to propose a design.
  • Quantity per size (for example two load classes with different quantities), because the pattern or wax die is made per size.

If a load figure appears in your enquiry without a standard behind it, we will ask which standard it refers to before we price.

Should SS316L mooring cleats be cast, forged or fabricated from plate?

For a shaped cleat with curved horns and a base that must be bolted or welded to the deck, investment casting or sand casting is usually the practical route; fabrication from plate suits very large or very simple cleats.

  • Investment (lost-wax) casting gives a smooth surface and close as-cast shape, which suits small and medium cleats that will be mirror polished. Our investment casting parts range from 0.05 to 50 kg.
  • Sand casting has lower tooling cost and suits heavier cleats; the surface is rougher and needs more finishing. Heavier cleats can be produced through our partner foundries.
  • Fabrication (cut and welded plate or bar) needs no casting tooling and can be quick for a small batch, but welds are a place where corrosion starts if they are not finished and passivated, and the shape is less rounded for rope wear.

Ask for the casting route and fabrication route to be quoted side by side if the quantity is a few hundred pieces, as the crossover depends on the size.

Is 316L the right grade, or should the cleat be cast in CF8M?

Cast parts are usually specified by the cast grade (CF3M or CF8M, the cast equivalents of 316L and 316), while the wrought name 316L is used on bar and plate; make clear in the RFQ which family you mean. Many buyers write SS316L for a casting and expect the chemistry and corrosion behaviour of low-carbon 316. We can quote either and will state the grade on the material certificate. Our guide to CF8M and CF3M versus 316 and 316L explains the difference in detail. For continuous seawater exposure, also say whether the cleat is above deck, in the splash zone or immersed, since a duplex grade may be worth discussing for harsh duty.

What testing and documents can be supplied with the cleats?

A material certificate to EN 10204 3.1 and a passivation certificate are standard documents, and a proof-load test on sample pieces can be agreed in advance.

  • Chemical analysis by OES spectrometer on the heat, reported on the EN 10204 3.1 certificate.
  • Passivation to ASTM A967 as standard finishing for marine parts.
  • Optional salt spray test (72 h or 96 h to ASTM B117) on sample pieces. Note that salt spray is a comparison test, not a prediction of life at sea.
  • Proof-load testing of a sample: agree the test load, the holding time and who witnesses it before the order, because it affects the schedule.

If your customer needs third-party inspection or class approval, say so in the first message so the cost and timing are in the quotation.

What finish should I ask for: mirror polish, electropolish or passivation only?

Passivation is the minimum for marine stainless, and electropolishing or mirror polishing reduces places where chlorides can collect. A smooth surface resists tea staining and is easier to clean, and the rope-contact area of a cleat benefits from a polished radius that does not chafe the line. Mirror polishing is slower and adds cost, so apply it where it matters (visible surfaces and rope contact) and leave non-visible bases as cast and passivated if the specification allows. Always ask for the roughness target in microns instead of a descriptive word such as mirror.

What changes the price and the lead time of a cleat order?

Size and weight, the number of load classes, the casting route, machining and finish, and testing decide the price; tooling and sample approval decide the first-delivery time.

  • Each cleat size needs its own tooling, so two load classes mean two tooling sets, spread over each quantity.
  • Weight drives material cost per piece, and the stainless alloy price moves with nickel and molybdenum.
  • Machining of the base holes and the contact faces, and the polishing level, add labour.
  • Third-party testing and extra certificates add cost and days.
  • Our standard stages are tooling 5–7 working days, samples 7–10 working days and mass production 3–5 weeks, with sea freight or air freight added for delivery.

Send the drawing or a reference photo with the rating, the quantities per size, the grade, the finish and the destination through our contact page and we will return a quotation with tooling, samples, unit price and shipping as separate lines.

Have a drawing? Send your STEP or PDF file with quantity, material and finish. Our engineers reply within 24 business hours with DFM feedback and a quote.

Request a quote